Wireless Monitoring for Production Machine Status
SSCN NumberĀ : SSCN-0001
Project NumberĀ : FASMY-1802-006
SolutionĀ : Patlite Wireless Data Acquisition
Industries : Metal and Machine Tools
Problem Statement
– No information about machine status on the production floor.
– All planning is base on manual recording data.
– Required additional manpower for the recording and reading is a variance from Actual.
– The mechanical machine does not have any controller for digitalization.
Solutions
– Install Patlite Wireless signal tower light on each machine.
– Machine status will transmit via tower light and consolidate at Mitsubishi PLC.
– All the data will be visualized by using FAS customization software.
– Real-time production performance can be determined.
Results
– Reduce manpower for all the manual recording and auto-generation of production report.
– Increase productivity and OEE.
– No messy wiring is required.